DELIVERY AND ASSEMBLY OF A GAS AND STEAM POWER UNIT IN THE ŻERAŃ CHP PLANT IN WARSAW

Scope implemented by Polimex Energetyka:

  • assembly of steel structures (4,200 tons)
  • assembly of technological devices (250 tons)
  • assembly of light casings (10,500 m2)
  • assembly of technological pipelines (800 tons)

 

 

A SEMI-DRY FLUE GAS DESULPHURISATION INSTALLATION ALONG WITH A DRY ASH DISTRIBUTION INSTALLATION FOR TWO BENSON OP-206 BOILERS IN THE POMORZANY CHP PLANT IN SZCZECIN (IN A CONSORTIUM WITH DOOSAN LENTJES GMBH)

Scope implemented by Polimex Energetyka:

  • assembly of steel structures (400 tons)
  • integration and assembly of ducts (400 tons)
  • dismantling of ducts (150 tons)
  • assembly of technological devices (52 tons)
  • assembly of technological pipelines (55 tons)

 

 

MODERNIZATION OF THE CFB-670 BOILERS IN THE POWER UNITS 1-3 FOR PGE GIEK S.A. IN THE TURÓW POWER PLANT BRANCH

Scope implemented by Polimex Energetyka:

  • assembly of steel structures (450 tons)
  • assembly of technological devices (520 tons)
  • assembly of light casings (800 m2)
  • assembly of technological pipelines (220 tons)
Project Cable Trays on Blast Furnance no 6, TATA Steel Ijmuiden, the Netherlands
  • Scope of works: engineering, workshop documentation,fabrication, delivery and erection of a steel structure including strengthening of existing elements, civil works and also delivery and erection of cable ladder elements together with wall and roof cold cladding as a support for new electrical cables to be installed during repair maintenance of the object.
  • Tonnage of project: about 180 tons
  • Location: iJmuiden, Netherlands
  • Date of realization: 2020 / 2021

Obrazki galerii: 

  • PROJECT KEMSLEY, ENGLAND (UK)

Scope of works: delivery, prefabrication and erection of pipelines and installation of equipment.

Tonnage of project: 69,7 tons of piping, 7 tons of support structure, 14,1 tons of equipment.

Location: Kemsley, England

Kempsey

Obrazki galerii: 

 

  • PROJECT EARLS GATE IN SCOTLAND (UK)

Assembly of a flue gas treatment unit and the support structure (200 tons) along with the installation of equipment: flue gas ducts, a bag filter, silos, fans and conveyors (254 tons). Project implemented in 2020.

 

Obrazki galerii: 

  • PROJECT RAMBERVILLERS (FRANCJA)


Assembly of a support structure for the boiler (428 tons) and a flue gas treatment unit (182 tons). Installation of equipment (284 tons): ducts, a bag filter, an SCR reactor, fans, silos or mechanical conveyors. Project implemented in 2020.

   

Obrazki galerii: 

  • Workshop project, delivery and assembly of steel structures (805 tons) for the boiler room in the Palm paper mill, Aalen-Neukochen, Germany.

AALEN

Obrazki galerii: 

  • Workshop project, delivery and assembly of steel structures along with a casing for the wall and the roofs of a technological installation (1,100 tons) for the transportation of metallurgical materials to Amsterdam, the Netherlands

TATA

Obrazki galerii: 

  • Workshop project, delivery and assembly of steel structures for the boiler room in Annecy, France (130 tons)

ANNECY

Obrazki galerii: 

 

Delivery of steel structures for the boiler in Hooton, UK (470 tons)HOOTON

 

Implemented projects

EPC

Supply and installation of two turbine generator sets with a capacity of 100 MWe each, along with design and accompanying work in the Żerań CHP. Client: the Power Plants in Warsaw SA (PGNiG Termika SA). Contract value: PLN 140 million Tz11 + PLN 171 million Tz12.

Implementation of Wet Flue Gas Desulphurization Installation in the Power Plant Rybnik. Client: Power Rybnik. Value of the contract: PLN 228 million.

Construction of the installation of renewable energy production based on biomass in the CHP Bialystok SA. Client: CHP Bialystok SA. Contract value: PLN 85 million.

Construction of a new Water Treatment Plant in the Nitrogen Plant in Kędzierzyn. Contract value: PLN 63 million.

Coaling plant construction in Belchatow. Client: SANDVIK Mining and Construction. Contract value: PLN 83.8 million.

Design, construction, supply of machinery and equipment, and installation of a complete Flue Gas Desulphurization block No. 10 - 500 MW. Client: "Kozienice" SA Power Plant (ENEA Production SA). Contract value: PLN 75.5 million.

Construction of a new power unit with a fluidized bed boiler, backpressure turbine, two peak boilers and heat accumulator in the Bielsko-Biala EC1 Power Plant. Client: PKE SA. Contract value: PLN 409.7 million.

Construction of a catalytic denitrification plant for OP-430 block boilers No. 10, 14, 15 and OP-380 boiler No. 11 in Siekierki. Client: Vattenafall Heat Poland SA (PGNiG Termika SA). Contract value: PLN 140 million.

 

Professional assembly

PLN Pressure part assembly in two boilers with a capacity of 1100 MW at Neurath. Client: Hitachi Power Europe, Alstom Power Boiler. Contract value: PLN 107.1 million.

Pressure part assembly in a boiler within the package No. 1,2,4,5 for a block of 858 MW in the Belchatow power plant. Client: ALSTOM Power Sp. z o. o. and RAFAKO SA. Boiler Factory. Contract value: PLN 59.5 million.

 

Foreign contracts

PLN PAPER MILL IGGESUND, SWEDEN. Scope of works: supply and installation of steel structures with walls and roof construction. Client: Andritz Oy. Net value of the contract: PLN 31 million.

WASTE TO ENERGY PLANT, HELSINGBORG, SWEDEN. Scope of works: supply and erection of steel structure and channels (c. 1800 tons), installation of a boiler (about 800 tons), delivery and installation of piping (about 150 tons), installation of process equipment. Client: Babcock & Wilcox Vølund A/S, NCC Construction Sverige AB. Value: PLN 38.8 million.

IGNIS POWER PLANT, SPREMBERG, GERMANY. Scope of works: supply and installation of steel structures. Client: Baumgarte Boiler Systems GmbH. Value: PLN 15.2 million.

PULP MILL ENCE, HUELVA, SPAIN. Scope of works: supply and installation of steel structures with walls and roof construction. Client: Andritz Oy. Value: PLN 13.9 million