The Swidnica bypass, built by Polimex-Mostostal SA, is open
On the fifth of September, first cars were going on the "small" bypass. The new road brings transit truck outside the city limits.
The Swidnica bypass joined the national road No. 35 (Wroclaw, Walbrzych) in Słotwin wand the provincial road No. 382 in the direction of Strzegom and with Swidnica connection to A-4, through the Solidarity roundabout. Swidnica has not had any bypass and traffic used: provincial road No. 382 and national road No. 35 through the city center.
Vehicles on the city center streets were a nuisance to residents. The bypass shall eliminate the inconvenience, except that it improves quality of travel through the Swidnica region.
The Lower Silesian Road and Rail Service in Wroclaw is the investor is the Swidnica bypass. The bypass is approx. 3.2 km long, its cost amounted to approx. PLN 34 million of which approx. PLN 15 million came from the EU co-financing from the European Regional Development Fund under the Regional Operational Programme for the Lower Silesian Voivodship for the years 2007 – 2013. Polimex-Mostostal SA is the contractor.