1

PGE GIEK Bełchatów

Construction of the suspension production and pumping system together with the modernization of reservoirs No. 1 and 2 at Bełchatów Power Plant

2017.03

2018.08

under way

2

SYNTHOS Oświęcim

Piping of chemical installations at the SYNTHOS plant in Oświęcim

2017.07

2018.01

3

Polimex Mostostal S.A.

Delivery and installation of cooling water pipelines on boiler block 5,6 in Opole Power Plant

2017.04

2018.12

under way

4

GE Power

Execution of technological part of task "Wash water pipelines on unit 858MW in Power Plant Bełchatów".

2016.08

2016.10

5

E003B7 Sp. z o.o.

Manufacturing of steel part of absorber and FGD steel tanks along with platforms and steel structure for limestone powder reservoir in Power Plant Jaworzno.

2016.08

2018.11

under way

6

Andritz AG

Manufacturing of steel part of absorber and FGD steel tanks along with platforms and steel structure for limestone powder reservoir in Power Plant Jaworzno.

2015.06

2016.09

7

Finow Polska Sp. z o.o.

Manufacturing of steel structure elements for diverter casing, Blankingplate Casing.

2016.05

2016.06

9

Polimex Mostostal S.A.

Erection of slag trap along with scraper conveyor, crusher, oscillation sieve and support structure of boiler room. Construction of unit 1075MW in Power Plant Kozienice

2016.04

2016.12

10

Grupa Azoty Zakłady Chemiczne "Police" S.A.

Construction of absorber for Desulphurisation System of boilers K-1 and K-2 in Heat and Power Plant No. 2 in Grupa Azoty Zakłady Chemiczne "Police" S.A.

2016.04

2016.11

11

Polimex Energetyka
Sp. z o.o.

Erection of ducts in Kozienice Power Plant

2016.01

2016.04

12

Andritz AG

Manufacturing of steel constructions for project of Faisalabad in Pakistan

2016.01

2016.03

13

Andritz AG

Manufacturing of steel constructions of hangers and suspensions for project of Faisalabad in Pakistan

2016.01

2016.04

14

Bertschenergy GmbH

Manufacturing of flu gas ducts for project of Omira

2016.01

2016.04

15

Andritz AG

Manufacturing of steel constructions for project of Tocopilla / Ventanas in Chile

2016.01

2016.02

16

Babcock Borsig Steinmuller GmbH

Making of delivery of materials for blowing of pipelines of unit no 9 in PGE GiEK S.A. O. Elektrownia Bełchatów

2015.10

2015.12

17

RAMB Sp. z o.o.

Manufacturing, delivery and assembly works of consruction of 3 tanks for stage III. II and I including membrane

2015.10

2016.01

18

Wallstein GmbH

Making of repair works for modernization of unit no 9 in PGE GiEK S.A. O. Elektrownia Bełchatów

2015.09

2015.10

19

Knauf Bełchatów Sp. z o.o.

Making of erection of silo including platforms in Knauf Bełchatów Sp. z o.o.'s plant, Gipsowa 3 street, Rogowiec

2015.09

2015.12

20

Polimex Enegetyka Sp. z o.o.

Making of welding services (135/111/141 method) and erection works during execution of Purchaser's erection works of steel constructions and erection of ESP's ducts (electrostatic precipitator) in Power Unit No 11 in Kozienice Power Plant (596 ton)

2015.10

2016.01

21

Polimex Energetyka Sp. z o.o.

Making of welding services (135/111/141 method) and erection works during execution of Purchaser's erection works of steel constructions and erection of ESP's ducts (electrostatic precipitator) in Power Unit No 11 in Kozienice Power Plant (274 ton)

2015.09

2015.12

22

Energo-Mechanik Sp. z o.o.

Making of cleaning works (abrasive blast cleaning method) of outlet flap, bypass flap and abrassive flap, and making of chemo resistant protection of bypass flap in PGE GiEK S.A. O. Elektrownia Bełchatów

2015.09

2015.09

23

Andritz Energy & Environment GmbH

Manufacturing of steel elements for reactor and flue gas ducts for project of Siekierki II

2015.06

2016.03

24

Bilfinger ELWO S.A.

Making of modernization of ,,ELWO'' mixers for fly ash handling instalaltion in PGE GiEK S.A. O. Elektrownia Bełchatów

2015.06

2015.07

25

Babcock Borsig Steinmuller GmbH

Making of delivery of steel materials for modernization of power unit no 10 in PGE GiEK S.A. O. Elektrownia Bełchatów

2015.10

2016.03

26

Babcock Borsig Steinmuller GmbH

Making of delivery of steel materials for modernization of power unit no 9 in PGE GiEK S.A. O. Elektrownia Bełchatów

2015.05

2015.10

27

Andritz Energy & Environment GmbH

Manufacturing of steel elements for project of Riikinvoima in Finland

2015.03

2015.09

28

Andritz Energy & Environment GmbH

Manufacturing of bunkers and silos for project of Zofiówka

2015.03

2015.09

29

Andritz Energy & Environment GmbH

Manufacturing of air ducts and flue gas ducts for project of Riikinvoima in Finland

2015.03

2015.12

30

PGE GiEK S.A. O. Elektrownia Bełchatów

Making of works for invest ,,Change of technology of handling of fly ash in PGE GiEK S.A. O. Elektrownia Bełchatów - making of fly ash handling installation - execution of commisioning team's orders"

2015.03

2015.07

31

Babcock Borsig Steinmuller GmbH

Making of erection works (package No 4) for boiler No 10 in PGE Bełchatów Power Plant - pipelines

2015.08

2016.03

32

Babcock Borsig Steinmuller GmbH

Making of erection works (package No 4) for boiler No 9 in PGE Bełchatów Power Plant - pipelines

2015.05

2015.10

33

Babcock Borsig Steinmuller GmbH

Making of erection works (package No 5.2) for boiler No 10 in PGE Bełchatów Power Plant - hot air ducts

2015.08

2016.03

34

Babcock Borsig Steinmuller GmbH

Making of erection works (package No 5.2) for boiler No 9 in PGE Bełchatów Power Plant - hot air ducts

2015.05

2015.12

35

Babcock Borsig Steinmuller GmbH

Making of erection works (package No 4.1) for boiler No 11 in PGE Bełchatów Power Plant

2014.11

2014.12

36

Babcock Borsig Steinmuller GmbH

Making of erection works (package No 5.2) for boiler No 12 in PGE Bełchatów Power Plant

2014.11

2014.12

37

Wallstein Ingenieur GmbH

Making of modernization of heat exchangers and flue gas ducts for boiler No 9 in PGE Bełchatów Power Plant

2015.05

2015.11

38

Polimex-Mostostal S.A.

Making of erection works for ducts (136 ton) for unit no 11 in ENEA Wytwarzanie S.A. in Kozienice

2015.01

2015.01

39

Knauf Bauprodukte Polska Sp. z o.o.

Making of delivery and erection of steel constructions, silos and building works of roof of workshop in Investor's works in Rogowiec, Gipsowa 5 street

2015.01

2015.02

40

EkoBenz Sp.z o.o.

Making of building works of synthetic ethanol fuel production plant (22 500 ton / year) with necessary buildings in Bogumiłów, Kleszczów at area 5,5619 ha, including permission to use

2014.11

2016.04

41

Kanuf Bełchatów Sp. z o.o.

Making of building works of warehouse in Investor's works in Rogowiec, Gipsowa 5 street

2015.01

2015.03

42

Babcock Borsig Steinmuller GmbH

Making of delivery of parts of pipelines for unit no 12 in Bełchatów Power

2014.11

2014.11

43

Polimex-Mostostal S.A.

Making of erection works for pressure part of boiler (package 3) - erection of pipelines between chambers and coils (making of butt welds pipe - pipe in amount 30.770 items) for unit no 11 in ENEA Wytwarzanie S.A. in Kozienice

2015.03

2015.11

44

Polimex-Mostostal S.A.

Making of erection works for outer high pressure pipelines HP and inner pipelines (package 4) for unit no 11 in ENEA Wytwarzanie S.A. in Kozienice

2015.02

2016.01

45

Polimex-Mostostal S.A.

Making of mechanical erection works for 2 items of air superheaters type Alsotm LCVZQ 34,7 / 2200 for unit no 11 in ENEA Wytwarzanie S.A. in Kozienice

2014.11

2015.08

46

Andritz Energy & Environment GmbH

Manufaturing of nozzle box roofs for invest Busan in South Korea

2014.10

2014.12

47

EDF Polska S.A.

Making of delivery, civil works, erection, start up and commissioning of installation of flue gass ducts in EDF Polska S.A. Power Plant in Rybnik

2014.07

2016.04

48

Babcock Borsig Steinmuller GmbH

Making of delivery of pipelines for digestion and blowing in unit no 11 in Elektrownia Bełchatów

2014.06

2014.07

49

Andritz Energy & Environment GmbH

Making of 1 item of ash silo and 1 item of sand silo for invest Miolby in Sweden

2014.06

2015.01

50

PGE GiEK S.A. O. Elektrownia Bełchatów

Making of transport installation of ash-water high density slurry in PGE GiEK S.A. O. Elektrownia Bełchatów - additional works

2014.06

2014.12

51

Babcock Borsig Steinmuller GmbH

Manufacturing and delivery of cold air ducts for unit no 12 in Elektrownia Bełchatów

2014.05

2014.08

52

Andritz Energy & Environment GmbH

Manufacturing of 3 silos (sand, bed-ash,
fly-ash) for invest in EC Siekierki

2014.05

2014.08

53

Strabag Sp. z o.o.

Manufacturing and delivery of steel constructions for invest ,,Making of boiler OP 650K for unit no 9, 10, 11 and 12 in PKE S.A. Elektrownia Łaziska for reduction of NOX emissions"

2014.05

2014.10

54

RAFAKO S.A.

Making of cleaning, removal and utilization of ash from flue-gas duct of unit no 12 in Elektrownia Bełchatów

2014.05

2014.05

55

Knauf Engineering Sp. z o.o.

Making of repair works of hot gas generator in Knauf Jworzno III Sp. z o.o.'s workshop

2014.02

2014.02

56

PGE GiEK S.A. O. Elekrownia Bełchatów

Making of transport installation of ash-water high density slurry in PGE GiEK S.A. O. Elektrownia Bełchatów - additional works

2013.10

2014.08

57

PGE GiEK S.A. O. Elekrownia Bełchatów

Making of modernization of secondary superheat pipelines of units No 9-12 in PGE GiEK S.A. O. Elektrownia Bełchatów

2013.09

2016.09

58

Babcock Borsig Steinmuller GmbH

Making of erection works (package No 5.2) for boiler No 12 in PGE Bełchatów Power Plant

2014.04

2014.12

59

Babcock Borsig Steinmuller GmbH

Making of erection works (package No 4.1) for boiler No 12 in PGE Bełchatów Power Plant - connective pipelines of boiler's chambers

2014.04

2014.08

60

Babcock Borsig Steinmuller GmbH

Making of erection works (package No 5.2) for boiler No 11 in PGE Bełchatów Power Plant

2013.11

2014.07

61

Babcock Borsig Steinmuller GmbH

Making of erection works (package No 4.1) for boiler No 11 in PGE Bełchatów Power Plant - connective pipelines of boiler's chambers

2013.11

2014.07

62

Knauf Bauprodukte Polska Sp. z o.o.

Making of foundations of coal dust silo and bridge support of pipelines in plant of Knauf Bauprodukte Polska Sp. z o.o. in Rogowiec

2013.09

2013.09

63

Knauf Bauprodukte Polska Sp. z o.o.

Making of technology building (first floor) in plant of Knauf Bauprodukte Polska Sp. z o.o. in Rogowiec

2013.09

2013.12

64

Andritz Energy & Environment GmbH

Manufacturing of steel constructios for project DOMSJO in Sweden

2013.08

2013.09

65

Andritz Energy & Environment GmbH

Making of prefabrication of air ducts and flue gas ducts for project FHW ARSENAL in Austria

2013.07

2013.10

66

Fabryka Wenylatorów FAWENT S.A.

Making of disassembly works and assembly works for two silencers of suction ducts for two air fans for boiler No 6 in PGE GiEK S.A. O. Elekrownia Bełchatów

2013.06

2013.10

67

Andritz Energy & Environment GmbH

Manufacturing of elements of ducts and silos for project VARTAVERKET - Stockholm in Sweden

2013.09

2014.06

68

GBT Polska Sp. z o.o.

Making of disassembly and assembly of 2x4 items of absorber's circular pipelines for modernization of unit 5 and 6 in PGE Bełchatów Power Plant

2013.07

2013.09

69

Andritz Energy & Environment GmbH

Manufacturing of flue ducts and air ducts for project Nymolla in Sweden

2013.06

2013.08

70

Zespół Elektrociepłowni Wrocławskich KOGENERACJA S.A.

Making of fire and explosion protection of installation for biomass silos in EC Czechnica

2013.05

2013.08

71

RAFAKO S.A.

Manufacturing, delivery, disassembly and assembly of parts for IOS' modernization of unit 5 and 6 in PGE Elekrownia Bełchatów

2013.05

2015.04

72

PGE GiEK S.A. O. Elektrownia Bełchatów

Making of erection-welding works for pipelines of M2 superheater in unit no 2 in PGE Bełchatów Power Plant

2013.05

2013.05

73

Knauf Bełchatów Sp. z o.o.

Delivery and assembly of ventilation in calcination house in Knauf Bełchatów Sp. z o.o.

2013.05

2013.05

74

Zakład Wodociągów i Kanalizacji WOD-KAN Sp. z o.o.

Building and modernization of water and sewerage network in Bełchatów

2013.04

2014.09

75

Politechnika Wrocławska

Delivery, assembly and start up of pilot heat recovery installation of waste heat from outlet ducts of BB-1150 boiler in PGE Bełchatów Power Plant

2013.04

2013.05

76

Knauf Bełchatów Sp. z o.o.

Making of cladding of walls and roof of calcination house in Knauf Bełchatów Sp. z o.o.

2013.04

2013.06

77

Knauf Bełchatów Sp. z o.o.

Delivery and erection of ducts in Knauf Bełchatów Sp. z o.o.

2013.03

2013.06

78

PGE GiEK S.A. O. Elektrownia Bełchatów

Making of delivery of appliances and equipments, making of disassembly works and assembly works, start up, adjustment operation, test run for invest ''Transport of ash-water high density slurry in PGE GiEK S.A. O. Elektrownia Bełchatów"

2013.01

2015.01

79

Babcock Borsig Steinmuller GmbH

Delivery of materials for blowig system for unit no 8 in PGE GiEK S.A. O. Elektrownia Bełchatów

2012.12

2013.02

80

Elektrownia Połaniec S.A. - Grupa GDF Suez Energia Polska

Making of agro biomass plant and forest biomass plant in Elektrownia Połaniec

2012.11

2013.11

81

Babcock Borsig Steinmuller GmbH

Making of erection works for damper for unit no 8 in PGE GiEK S.A. O. Elektrownia Bełchatów

2012.12

2012.12

82

Babcock Borsig Steinmuller GmbH

Making of disassembly works of duct for unit no 8 in PGE GiEK S.A. O. Elektrownia Bełchatów

2012.11

2012.12

83

Andritz Energy & Environment GmbH

Manufacturing of steel constructions for invest Vasilicos in Cyprus

2012.10

2012.10

84

Andritz Energy & Environment GmbH

Manufacturing of air and flue gas ducts for invest Blackburn Meadows in Great Britain

2012.10

2013.05

85

Andritz Energy & Environment GmbH

Manufacturing of air and flue gas ducts for invest Temiscaming in Canada

2012.08

2012.10

86

Andritz Energy & Environment GmbH

Manufacturing of steel elements ,,Kohleschurren" for invest Yunus Emre in Turkey

2012.08

2012.09

87

Wallstein Ingenieur GmbH

Making of electrical works and I & C works for invest called modernization of IOS heat exchanger of unit no 7 in PGE GiEK S.A. O. Elektrownia Bełchatów

2012.07

2012.08

88

Knauf Bełchatów Sp. z o.o.

Manufacturing and erection of steel construction of calcination building for Knauf company in Rogowiec

2012.07

2012.08

89

Knauf Bełchatów Sp. z o.o.

Making of technical building with laboratory for new mixing building and production line of gypsum in Knauf company in Rogowiec

2012.06

2012.09

90

Babcock Borsig Steinmuller GmbH

Manufacturing and delivery of materials (pipes, molders, supports, corrosion protection) for devices of unit no 7 in PGE GiEK S.A. O. Elektrownia Bełchatów

2012.06

2012.07

91

RAFAKO S.A.

Manufacturing of platforms of electrofilter axes 1 with fasteners for invest called replacement of electrostatic precipitator of unit no 3 in Elekrownia Kozienice

2012.06

2012.06

92

RAFAKO S.A.

Making of repair works of flue gass ducts, delivery and making of rubber coating for modrnization of gass heating system of units no 8, 10, 11 and 12 in PGE GiEK S.A. O. Elektrownia Bełchatów

2012.06

2016.03

93

RAFAKO S.A.

Making of erection works of boiler OS-95 of garbage incineration in Roskilde KARA / NOVERN I/s Denmark

2012.05

2013.05

94

Babcock Borsig Steinmuller GmbH

Making of erection of part of cold air ducts 07NG02 for unit no 7 in PGE GiEK S.A. O. Elektrownia Bełchatów

2012.05

2012.05

95

Wallstein Ingenieur GmbH

Making of modernization of gas-gas heat exchanger for unit no 7 in PGE GiEK S.A. O. Elektrownia Bełchatów

2012.04

2012.08

96

RAFAKO S.A.

Making and delivery of stainless elements to building site of IOS unit no 1 and 2 in PGE GiEK S.A. O. Elektrownia Bełchatów

2012.04

2012.05

97

Babcock Borsig Steinmuller GmbH

Making of repair works for surfaces M2 and P3 for unit no 7 in PGE GiEK S.A. O. Elektrownia Bełchatów

2012.02

2012.05

98

RAFAKO S.A.

Manufacturing and test erection of 12 sets of ash hoppers for steam boiler in garbage incineration in Roskilde KARA / NOVERN I/s Denmark

2012.02

2012.04

99

Babcock Borsing Steinmuller GmbH

Making of disassembly and assembly works for pakage No 6 in unit No 8 in PGE GiEK S.A. O. Elektrownia Bełchatów

2012.02

2012.10

100

Babcock Borsing Steinmuller GmbH

Making of disassembly and assembly works for pakage No 4 in unit No 8 in PGE GiEK S.A. O. Elektrownia Bełchatów - connective pipelines of boiler's chambers

2012.02

2012.10

101

Babcock Borsing Steinmuller GmbH

Making of disassembly and assembly works for pakage No 6 in unit No 7 in PGE GiEK S.A. O. Elektrownia Bełchatów

2012.02

2012.06

102

Babcock Borsing Steinmuller GmbH

Making of disassembly and assembly works for pakage No 4 in unit No 7 in PGE GiEK S.A. O. Elektrownia Bełchatów - connective pipelines of boiler's chambers

2012.02

2012.06

103

Knauf Bełchatów Sp. z o.o.

Execution of gypsum silo, capacity 1000 ton, with necessary technical equipment in client's workshop in Rogowiec

2012.02

2012.03

104

Alstom Power Sp. z o.o.

Making of services for guarantee's period of 858MW unit in PGE GiEK S.A. O. Elektrownia Bełchatów

2012.01

2014.12

105

Knauf Bełchatów Sp. z o.o.

Making of reinforced concrete foundations of building of mixing of construction materials and gypsum calcination plant with appliances in Investor's workshop in Rogowiec

2011.12

2012.02

106

Elektrociepłownia Białystok S.A.

Making of additional works for invest ,,Making of heat accumulator for heating system in EC Biaystok”.

2011.11

2011.12

107

PGE Górnictwo i Energetyka Konwencjonalna S.A. Oddział Elektrownia Bełchatów

Making of works for invest ,,Ash landfill ,,Zwałowisko” - repair works for drainage ditches and drain pipes in western side, tank no 3 – repair works of demages" in PGE GiEK S.A. O. Elektrownia Bełchatów

2011.11

2011.11

108

GBT POLSKA Sp. z o.o.

Manufacturing and delivery of steel tanks

2011.10

2011.12

109

Knauf Bełchatów Sp. z o.o.

Making of structure of: mixing tower with necessary appliances and infrastructure in Inwestor's workshop in Rogowiec.

2011.10

2012.06

110

Zespół Elektrociepłowni Wrocławskich KOGENERACJA S.A.

Project, delivery, erection and start up of pulsator's installation of cleaning system for internal walls in biomass tank in EC Wrocław

2011.10

2011.12

111

Zespół Elektrociepłowni Wrocławskich KOGENERACJA S.A.

Manufacturing and erection of biomass tank in EC Wrocław

2011.10

2011.11

112

PGE Górnictwo i Energetyka Konwencjonalna S.A. Oddział Elektrownia Bełchatów

Manufacturing and delivery of exchangers for Condensate Polishing Plant of boilers no 7 and 8 in PGE GiEK S.A. O. Elektrownia Bełchatów

2012.01

2012.06

113

RAFAKO S.A.

Manufacturing, delivery and supervision over erection and start up of vessels of inertial material and bottom ash, for boiler Ofz-201 for PKE S.A. Elektrownia Jaworzno III - Elektrownia II

2011.06

2011.08

114

RAFAKO S.A.

Manufacturing and delivery of flue gass ducts for set 6110 and air ducts for RPP for PKE S.A. Elektrownia Jaworzno III - Elektrownia II

2011.06

2011.10

115

Knauf Bauprodukte Polska Sp. z o.o.

Delivery and erection of 2 silos V = 60 m3 and steel constructions of building

2011.05

2011.06

116

PGE Górnictwo i Enegetyka Konwencjonalna S.A. Oddział Elektrownia Bełchatów

Execution of works for pressure parts of boiler no 10 in PGE GiEK S.A. O. Elektrownia Bełchatów

2011.05

2011.05

117

RAFAKO S.A.

Delivery and manufacturing of rubber coating for absorber, vessels and flue gass ducts with surface preparation for IOS of units no 1 i 2 in PGE GiEK S.A. O. Elektrownia Bełchatów

2011.05

2012.04

118

Alstom Power Sp. z o.o.

Making of works for auxiliary power station turbine BFPT failure for unit 858 MW in PGE GiEK S.A. O. Elektrownia Bełchatów

2011.01

2011.07

119

RAFAKO S.A.

Manufacturing of parts of electrostatic percipitator - unit B2 in Obrenovac Power Plant in Serbia

2011.01

2011.03

120

Przedsiębiorstwo Innowacyjno-Proukcyjne INKOM Sp. z o.o.

Execution of technological and erection works for invest: ,,Modernization of pump and hydrophone station S-3" in PGE GiEK S.A. O. Elektrownia Bełchatów

2011.01

2012.05

121

Elektrociepłownia Białystok S.A.

Making of additional works for invest; ,,Execution of heat accumulator for heating system in EC Białystok S.A."

2010.12

2010.12

122

Zespół Elektrociepłowni Wrocławskich KOGENERACJA S.A.

Delivery of spare parts for appliances of biomas system of boiler K2 in ,,Czechnica" Heat and Power

2010.12

2010.12

123

PGE Górnictwo i Enegetyka Konwencjonalna S.A. Oddział Elektrownia Bełchatów

Making of additional works for invest: ,,Execution of technical landfill site infrastructure and flexible membrane liner in tank no 3 in ,,Zwałowisko" ash landfill in Bełchatów Power Plant.

2010.12

2010.12

124

PGE Górnictwo i Enegetyka Konwencjonalna S.A. Oddział Elektrownia Bełchatów

Repair of demage of pump station W-4 in Bełchatów Power Plant

2010.11

2010.12

125

PGE Górnictwo i Enegetyka Konwencjonalna S.A. Oddział Elektrownia Bełchatów

Modernization of ion-exchanger station G-4.2, northern duct and unloading platform of chemicals in Bełchatów Power Plant

2010.11

2011.12

126

Elektrociepłownia Białystok S.A.

Making of additional works for invest; ,,Execution of heat accumulator for heating system in EC Białystok S.A."

2010.10

2010.11

127

RAFAKO S.A.

Manufacturing, delivery and erection of absorbers, flue gas fan, flue gas ducts with heat exchanger and supporting constructions for IOS of units no 1 and 2 in Bełchatów Power Plant

2010.09

2012.04

128

Elektrociepłownia Białystok S.A.

Building of heat system in Białystok Heat and Power Plant

2010.07

2012.01

129

Zespół Elektrociepłowni Wrocławskich KOGENERACJA S.A.

Modernization of infrastructure in biomass plant in EC Czechnica

2010.06

2010.07

130

RAFAKO S.A.

Manufacturing and delivery of inlet and exit flue gas ducts for electrostatic percipitator of boiler BB-1150 of unit no 5 and 6 in Bełchatów Power Plant

2010.05

2010.10

131

CHEMAR POWER AND INDUSTRIAL SERVICES Sp. z o.o.

Modernization of central steam and water pipelines for unt no 6 in Bełchatów Power Plant

2010.04

2011.06

132

RAFAKO S.A.

Manufacturing, delivery and erection of elements of flue gas ducts and suporting constructions for smoke conduits of IOS of unit no 1 and 2 in Bełchatów Power Plant

2010.04

2010.07

133

Zespół Elektrociepłowni Wrocławskich KOGENERACJA S.A.

Modification of weighting system for biomass fuel handling system in EC Czechnica

2010.04

2010.07

134

PGE Górnictwo i Enegetyka Konwencjonalna S.A. Oddział Elektrownia Bełchatów

Rebuilding and strengthening of roof +30,7 m over track-way C12 and C32 in bunker PII/4 in Bełchatów Power Plant

2010.04

2011.10

135

Chemar Rurociągi Sp. z o.o.

Modernization of central steam and water pipelines for unt no 5 in Bełchatów Power Plant

2010.03

2010.12

136

Chemar Rurociągi Sp. z o.o.

Full mechanical disassembly and erection of by-pass pipeline of boiler's system (LOS 4) for unit no 5 in Bełchatów Power Plant

2010.03

2010.12

137

Alstom Power Sp. z o.o.

Manufacturing and delivery of cooling water pipelines between unit 858 MW and CO2 Capture industrial plant in Bełchatów Power Plant

2010.03

2010.07

138

Alstom Power Sp. z o.o.

Erection of cooling water pipelines for CO2 Ready Project in Bełchatów Power Plant

2010.03

2010.11

139

RAFAKO S.A.

Manufacturing, delivery and erection of sulferized and desulferized flue gas ducts and erection of appliances for MIOS in EC Siekierki

2010.02

2011.06

140

RAMB Sp. z o.o.

Manufacturing and delivery of construction of conveyor

2010.01

2010.02

141

Knauf Bauprodukte Polska Sp. z o.o.

Making of assembly of production facilities in factory building

2009.12

2010.01

142

PGE Elektrownia Bełchatów S.A.

Modernization of pump station W-4 in Bełchatów Power Plant

2009.11

2010.12

143

Fortum Heat Polska Spółka z o.o.

Delivery of materials for low pressure pipelines in EC Częstochowa

2009.10

2009.12

144

Zespół Elektrociepłowni Wrocławskich KOGENERACJA S.A.

Extending of power appliances for biomass plant in EC Czechnica

2009.10

2010.05

145

PGE Elektrownia Bełchatów S.A.

Execution of technical landfill site infrastructure and flexible membrane liner of tank no 3 in ,,Zwałowisko” ash landfill.

2009.09

2011.06

146

Fabryka Kotłów Rafako S.A.

Erection of two complete absorbers with platforms and the erecion of the emergency dump tank with platforms -MIOS EC Siekierki

2009.05

2010.02

147

Konsortium; Alstom Power Sp. z o.o. and Fabryka Kotłów Rafako S.A.

Erection of ID and FD fans for unit 858 MW in Bełchatów Power Plant

2009.03

2010.05

148

Chemar Sp. z o.o.

Mechanical erection and disassembly of pipelines for unit 4 in Bełchatów Power Plant

2009.03

2009.11

149

Konsortium; Alstom Power Sp. z o.o. i Fabryka Kotłów Rafako S.A.

Mechanical erection of two Regenerative Air Pre Heaters for unit 858 MW in Bełchatów Power Plant

2009.03

2009.11

150

Zespół Elektrociepłowni Wrocławskich KOGENERACJA S.A.

Fuel Handling Sytem in EC Czechnica - turnkey investment

2009.01

2011.06

151

Fortum Heat Polska Spółka z o.o.

Delivery of materials for low and high pressure pipelines in EC Częstochowa

2009.01

2009.05

152

Alstom Power Sp. z o.o.

Mechanical erection of appliences Pii ROP for unit 858 MW in Bełchatów Power Plant

2008.12

2010.03

153

Austrian Energy & Environment GmbH

Manufacturing of steel elements for combustion chamber and condenser for Maxau project

2008.10

2009.07

154

Alstom Power Sp. z o.o.

Manufacturing and mechanical erection of pipelines SP NP. for unit 858 MW in Bełchatów Power Plant

2008.09

2009.09

155

Alstom Power Sp. z o.o.

Manufacturing and mechanical erection of pipelines package; L09, L11 for unit 858 MW in Bełchatów Power Plant

2008.09

2010.10

156

Alstom Power Sp. z o.o.

Manufacturing, delivery and erection of pipelines under our supervision for unit 858 MW in Bełchatów Power Plant

2008.09

2009.02

157

BOT Elektrownia Bełchatów S.A.

Modernization of heating pipelines system for new quantitative and quality needs

2008.05

2008.09

158

PGE Elektrownia Bełchatów S.A.

Manufacturing of steam pipelines and hydro-ash removal system for unit 858 MW in Bełchatów Power Plant

2008.04

2009.05

159

BWT Polska Sp. z o.o.

Delivery and erection of two clarifier internals for Water Treatment Plant for unit 858 MW in Bełchatów Power Plant

2008.04

2008.10

160

Austrian Energy & Environment GmbH

Manufacturing of flue ducts for unit 7 in Voest Alpine Linz company

2008.03

2008.08

161

PGE Elektrownia Bełchatów S.A.

Modernization of bases under conveyors C12, C22, C32 on roof +27,0 m in conveyor bunker PII/4 in Bełchatów Power Plant

2008.02

2011.12

162

Alstom Power Sp. z o.o.

Delivery of main cooling water pipelines for engine room, pump house and intake of cooling chimney for unit 858 MW in Bełchatów Power Plant

2008.01

2008.08

163

Alstom Power Sp. z o.o.

Manufacturing, delivery and erection of temporary steel covers for openings in roof 0,00 m in boiler house for unit 858 MW in Bechatów Power Plant

2007.12

2008.01

164

Fabryka Kotłów Rafako S.A.

Delivery and erection of steel construction of absorbent house and electrostatic percipitator house for IOS unit 858 MW in Bełchatów Power Plant. Erection of technological appliances in absorbent house for IOS unit 858 MW.

2007.08

2009.03

165

BOT Elektrownia Bełchatów S.A.

Erection of steam pipelines under turbine in unit 3

2007.08

2007.10

166

Fabryka Kotłów Rafako S.A.

Manufacturing of flue and air ducts for boiler BB2400 for unit 833 MW in Bełchatów Power Plant

2007.07

2008.08

167

Alstom Power Sp. z o.o.

Delivery and erection of steel construction of cooling water pipelines for unit 833 MW in Bełchatów Power Plant

2007.07

2008.06

168

Energop Sp. z o.o.

Erection of pipelines- left side of boiler no 3 RA, and RB, and erection of exausts in Bełchatów Power Plant

2007.07

2007.09

169

Fabryka Kotłów Rafako S.A.

Manufacturing, delivery and erection of electrostatic percipitator and platforms for IOS modernization, making of III- line of IOS system for unit 3 and 4 in Jaworzno III Power Plant

2007.06

2008.01

170

Fabryka Kotłów Rafako S.A.

Modernization of percipitators no 10, 11 and 12, manufacturing and erection of water vessels, and manufacturing and erection of gypsum vessel in Pątnów Power Plant

2007.04

2007.12

171

Austrian Energy & Environment GmbH

Erection of flue gas ducts, steel construction and process tanks for FGDP in Rybnik Power Plant

2007.03

2008.02

172

Bełchatów Power Plant S.A.

Repair works of high-pressure pipelines unit 1,4,9,10,11,12 in BOT Bełchatów Power Plant

2007.03

2007.12

173

Alstom Power Sp. z o.o.

Designing supply and supervision of pipelines HPMP instalation - turbine set modernisation unit 3 in BOT Bełchatów Power Plant

2007.01

2007.12

174

Bełchatów Power Plant S.A.

Modernisation of Ionites Regeneration Station in BOT Bełchatów Power Plant

2007.01

2007.12

175

Fabryka Kotłów Rafako S.A. Racibórz

Manufacturing, delivery and erection of process water vesel for IOS of units 1-4 in Pątnów Power Plant

2006.12

2007.05

176

Austrian Energy & Environment GmbH

Execution of exaust fume channels - AMAKHULU project

2006.11

2006.11

177

Zakład Urządzeń Odpylających

Manufacturing and erection of boiler for Alpol Gips company

2006.10

2006.11

178

Fabryka Kotłów Rafako S.A. Racibórz

Fabrication, delivery and erection of bag filter , reactor and staircase supporting construction for FGDP in Łódź Thermal-Electric Power Plant

2006.07

2007.07

179

Turów Power Plant

Modernisation of oil tanks in Turów Power Plant

2006.07

2007.09

180

Fabryka Kotłów Rafako S.A. Racibórz

Delivery and erection of steel construction and emergency tank for FGDP in Osrtołęka B

2006.07

2006.12

181

Fabryka Kotłów Rafako S.A. Racibórz

Disassembly and erection works during boiler OP-230 K1 modernisation in Konglomeracja Thermal-Electric Power Plant

2006.04

2006.12

182

Fabryka Kotłów Rafako S.A. Racibórz

Modernization of percipitators for unit 8 in Bełchatów Power Plant

2006.03

2006.06

183

EC Białystok S.A.

Modernization of waste-water disposal management in EC Białystok S.A.

2006.01

2008.01

184

SNC Lavalin Polska

Delivery and erection of water tanks and steel construction for Sorbent Preparation Building in Pątnów Power Plant

2005.11

2007.07

185

Bełchatów Power Plant S.A.

Modernisation of carburisation bridge PIII/11

2005.09

2005.11

186

Bełchatów Power Plant S.A.

Modernisation of carburisation bridge PIII/11 at Bełchatów Power Station

2005.09

2006.10

187

Fabryka Kotłów Rafako S.A. Racibórz

Erection of absorbers with equipment and delivery of absorber parts for FGDP unit 3 & 4 at Bełchatów Power Plant

2005.06

2006.12

188

Anwil S.A. Włocławek

Installation of GRP pipelines for C02,C03,C06,C09a,C09b objects at Anwil S.A. Włocławek

2005.05

2006.10

189

Elektrociepłownie Wybrzeże S.A.

Modernization of water and waste-water disposal management

2005.04

2006.12

190

Skalski S.A.

Expansion of workshop of Apol Gips

2005.04

2006.12

191

Fabryka Kotłów Rafako S.A. Racibórz

Delivery & erection of flue gas ducts and steel support structure for FGDP unit 3 & 4 at Bełchatów Power Plant

2005.03

2006.10

192

Knauf Bauprodukte

Expansion of loading and storage building

2005.01

2005.05

193

Bełchatów Power Plant S.A.

Erection of pump station Chabielice on Krasówka river

2004.11

2006.01

194

Fabryka Kotłów Rafako S.A. Racibórz

Manufacturing of pipeline and supporting construction for oil overpass for IOS for units 3 and 4 in Bełchatów Power Plant

2004.10

2005.02

195

Pabianickie Zakłady Farmaceutyczne PZF "POLFA" Pabianice

Manufacturing of cooling installation for WMF Polfa Pabianice

2004.04

2004.08

196

Bełchatów Power Plant 97-405 Bełchatów

Modernization of housing of carburisation bridge PII/11 in Bełchatów Power Plant

2003.11

2004.12

197

KNAUF Iphofen Germany

Development of KNAUF Bauprodukte

2003.10

2004.07

198

Bełchatów Power Plant 97-405 Bełchatów

Modernisation of carburisation bridge and PI/9 PI/7

2003.10

2004.06

199

Bełchatów Power Plant 97-405 Bełchatów

Electro filter modernisation KTD units: 5,6,8,9,10

2003.07

2003.12

200

Bełchatów Power Plant S.A.

Delivery and installation of pipelines transporting pulp from Bełchatów Power station to the KW Bełchatów mine.

2003.06

2004.12

201

Austrian Energy & Environment AG Graz

Design and production of steel structures for channels in Sarpsborg, Norway

2003.05

2004.01

202

Austrian Energy & Environment AG Graz

Design, production and delivery of steel structures for Zakłady Papiernicze in Świecie

2003.02

2003.07

203

Pabianickie Zakłady Farmaceutyczne PZF "POLFA" Pabianice

Construction of multipurpose Pharmaceutical Warehouse for PZF "POLFA" Pabianice

2003.01

2004.12

204

Langbein & Engelbracht Bochum Germany

Production and delivery of channel and vessel steel structures for projects in Hanover - Germany, Linz Austria, Grevenbroich - Germany, Lipek - Russia, Burgdorf – Switzerland

2003.01

2003.06

205

Bełchatów Power Plant S.A.

Restoring of production capacity of water pre-treatment plant for boiler circulation system in Bełchatów Power Plant

2002.12

2005.05

206

Enrgomontaż-Północ S.A. 03-876 Warszawa ul. Matuszewska 14

Production and installation of reinforcement TG-5 in Pątnów Power Plant II for block 460MW

2002.11

2003.05

207

Bełchatów Power Plant 97-405 Bełchatów

Erection of hydro- ash pipelines with supporting construction

2002.07

2004.04

208

Bełchatów Power Plant 97-405 Bełchatów

Electrofilter modernization KTD bl. number 1-4 and 12

2002.08

2003.08

209

Bełchatów Power Plant 97-405 Bełchatów

Modernisation of carburisation bridge Pl/ll

2001.05

2002.09

210

Fabryka Kotłów Rafako S.A. Racibórz

Delivery and installation of Exhaust fume sulphur removal system in bl. Nr 7 and 9

2001.05

2003.08

211

Elektrim Megadex S.A.

Production and delivery of turboreactor and preseparator for EC Siekierki

2001.04

2001.06

212

Enrgomontaż-Północ S.A. 03-876 Warszawa ul. Matuszewska 14

Electrofilter modernisation for 500 MW block in Kozienice Power Plant

2001.04

2001.10

213

Enrgomontaż-Północ S.A. 00-450 Warszawa ul. Przemysłowa 30

Production and installation of reinforcement TG-5 in Turów Power Plant

2001.01

2001.07

214

Babcoc Borsing Power Austrian Energy Graz

Production and delivery of channels, flooring and vessels for REA Niederrausem

2000.12

2001.03

215

Kopalnia Węgla Brunatnego "Bełchatów" S.A.

Production and construction of a hall TZ-1/TG-4 for mining support services

2000.10

2001.06

216

KWB Bełchatów

Assembly services for KWB Bełchatów

2000.04

2000.12

217

Rafako S.A. Ul. Łąkowa 33, Racibórz

Modernization of IOS block 5 and 6 in Bełchatów Power Plant

2000.01

2000.09

218

Elektrim Energetyka

Assembly and commissioning of 3 boilers in waste incineration station in Norymberg, Germany

2000.01

2000.12