1
|
PGE GIEK Bełchatów
|
Construction of the suspension production and pumping system together with the modernization of reservoirs No. 1 and 2 at Bełchatów Power Plant
|
2017.03
|
2018.08
|
under way
|
2
|
SYNTHOS Oświęcim
|
Piping of chemical installations at the SYNTHOS plant in Oświęcim
|
2017.07
|
2018.01
|
|
3
|
Polimex Mostostal S.A.
|
Delivery and installation of cooling water pipelines on boiler block 5,6 in Opole Power Plant
|
2017.04
|
2018.12
|
under way
|
4
|
GE Power
|
Execution of technological part of task "Wash water pipelines on unit 858MW in Power Plant Bełchatów".
|
2016.08
|
2016.10
|
|
5
|
E003B7 Sp. z o.o.
|
Manufacturing of steel part of absorber and FGD steel tanks along with platforms and steel structure for limestone powder reservoir in Power Plant Jaworzno.
|
2016.08
|
2018.11
|
under way
|
6
|
Andritz AG
|
Manufacturing of steel part of absorber and FGD steel tanks along with platforms and steel structure for limestone powder reservoir in Power Plant Jaworzno.
|
2015.06
|
2016.09
|
|
7
|
Finow Polska Sp. z o.o.
|
Manufacturing of steel structure elements for diverter casing, Blankingplate Casing.
|
2016.05
|
2016.06
|
|
9
|
Polimex Mostostal S.A.
|
Erection of slag trap along with scraper conveyor, crusher, oscillation sieve and support structure of boiler room. Construction of unit 1075MW in Power Plant Kozienice
|
2016.04
|
2016.12
|
|
10
|
Grupa Azoty Zakłady Chemiczne "Police" S.A.
|
Construction of absorber for Desulphurisation System of boilers K-1 and K-2 in Heat and Power Plant No. 2 in Grupa Azoty Zakłady Chemiczne "Police" S.A.
|
2016.04
|
2016.11
|
|
11
|
Polimex Energetyka Sp. z o.o.
|
Erection of ducts in Kozienice Power Plant
|
2016.01
|
2016.04
|
|
12
|
Andritz AG
|
Manufacturing of steel constructions for project of Faisalabad in Pakistan
|
2016.01
|
2016.03
|
|
13
|
Andritz AG
|
Manufacturing of steel constructions of hangers and suspensions for project of Faisalabad in Pakistan
|
2016.01
|
2016.04
|
|
14
|
Bertschenergy GmbH
|
Manufacturing of flu gas ducts for project of Omira
|
2016.01
|
2016.04
|
|
15
|
Andritz AG
|
Manufacturing of steel constructions for project of Tocopilla / Ventanas in Chile
|
2016.01
|
2016.02
|
|
16
|
Babcock Borsig Steinmuller GmbH
|
Making of delivery of materials for blowing of pipelines of unit no 9 in PGE GiEK S.A. O. Elektrownia Bełchatów
|
2015.10
|
2015.12
|
|
17
|
RAMB Sp. z o.o.
|
Manufacturing, delivery and assembly works of consruction of 3 tanks for stage III. II and I including membrane
|
2015.10
|
2016.01
|
|
18
|
Wallstein GmbH
|
Making of repair works for modernization of unit no 9 in PGE GiEK S.A. O. Elektrownia Bełchatów
|
2015.09
|
2015.10
|
|
19
|
Knauf Bełchatów Sp. z o.o.
|
Making of erection of silo including platforms in Knauf Bełchatów Sp. z o.o.'s plant, Gipsowa 3 street, Rogowiec
|
2015.09
|
2015.12
|
|
20
|
Polimex Enegetyka Sp. z o.o.
|
Making of welding services (135/111/141 method) and erection works during execution of Purchaser's erection works of steel constructions and erection of ESP's ducts (electrostatic precipitator) in Power Unit No 11 in Kozienice Power Plant (596 ton)
|
2015.10
|
2016.01
|
|
21
|
Polimex Energetyka Sp. z o.o.
|
Making of welding services (135/111/141 method) and erection works during execution of Purchaser's erection works of steel constructions and erection of ESP's ducts (electrostatic precipitator) in Power Unit No 11 in Kozienice Power Plant (274 ton)
|
2015.09
|
2015.12
|
|
22
|
Energo-Mechanik Sp. z o.o.
|
Making of cleaning works (abrasive blast cleaning method) of outlet flap, bypass flap and abrassive flap, and making of chemo resistant protection of bypass flap in PGE GiEK S.A. O. Elektrownia Bełchatów
|
2015.09
|
2015.09
|
|
23
|
Andritz Energy & Environment GmbH
|
Manufacturing of steel elements for reactor and flue gas ducts for project of Siekierki II
|
2015.06
|
2016.03
|
|
24
|
Bilfinger ELWO S.A.
|
Making of modernization of ,,ELWO'' mixers for fly ash handling instalaltion in PGE GiEK S.A. O. Elektrownia Bełchatów
|
2015.06
|
2015.07
|
|
25
|
Babcock Borsig Steinmuller GmbH
|
Making of delivery of steel materials for modernization of power unit no 10 in PGE GiEK S.A. O. Elektrownia Bełchatów
|
2015.10
|
2016.03
|
|
26
|
Babcock Borsig Steinmuller GmbH
|
Making of delivery of steel materials for modernization of power unit no 9 in PGE GiEK S.A. O. Elektrownia Bełchatów
|
2015.05
|
2015.10
|
|
27
|
Andritz Energy & Environment GmbH
|
Manufacturing of steel elements for project of Riikinvoima in Finland
|
2015.03
|
2015.09
|
|
28
|
Andritz Energy & Environment GmbH
|
Manufacturing of bunkers and silos for project of Zofiówka
|
2015.03
|
2015.09
|
|
29
|
Andritz Energy & Environment GmbH
|
Manufacturing of air ducts and flue gas ducts for project of Riikinvoima in Finland
|
2015.03
|
2015.12
|
|
30
|
PGE GiEK S.A. O. Elektrownia Bełchatów
|
Making of works for invest ,,Change of technology of handling of fly ash in PGE GiEK S.A. O. Elektrownia Bełchatów - making of fly ash handling installation - execution of commisioning team's orders"
|
2015.03
|
2015.07
|
|
31
|
Babcock Borsig Steinmuller GmbH
|
Making of erection works (package No 4) for boiler No 10 in PGE Bełchatów Power Plant - pipelines
|
2015.08
|
2016.03
|
|
32
|
Babcock Borsig Steinmuller GmbH
|
Making of erection works (package No 4) for boiler No 9 in PGE Bełchatów Power Plant - pipelines
|
2015.05
|
2015.10
|
|
33
|
Babcock Borsig Steinmuller GmbH
|
Making of erection works (package No 5.2) for boiler No 10 in PGE Bełchatów Power Plant - hot air ducts
|
2015.08
|
2016.03
|
|
34
|
Babcock Borsig Steinmuller GmbH
|
Making of erection works (package No 5.2) for boiler No 9 in PGE Bełchatów Power Plant - hot air ducts
|
2015.05
|
2015.12
|
|
35
|
Babcock Borsig Steinmuller GmbH
|
Making of erection works (package No 4.1) for boiler No 11 in PGE Bełchatów Power Plant
|
2014.11
|
2014.12
|
|
36
|
Babcock Borsig Steinmuller GmbH
|
Making of erection works (package No 5.2) for boiler No 12 in PGE Bełchatów Power Plant
|
2014.11
|
2014.12
|
|
37
|
Wallstein Ingenieur GmbH
|
Making of modernization of heat exchangers and flue gas ducts for boiler No 9 in PGE Bełchatów Power Plant
|
2015.05
|
2015.11
|
|
38
|
Polimex-Mostostal S.A.
|
Making of erection works for ducts (136 ton) for unit no 11 in ENEA Wytwarzanie S.A. in Kozienice
|
2015.01
|
2015.01
|
|
39
|
Knauf Bauprodukte Polska Sp. z o.o.
|
Making of delivery and erection of steel constructions, silos and building works of roof of workshop in Investor's works in Rogowiec, Gipsowa 5 street
|
2015.01
|
2015.02
|
|
40
|
EkoBenz Sp.z o.o.
|
Making of building works of synthetic ethanol fuel production plant (22 500 ton / year) with necessary buildings in Bogumiłów, Kleszczów at area 5,5619 ha, including permission to use
|
2014.11
|
2016.04
|
|
41
|
Kanuf Bełchatów Sp. z o.o.
|
Making of building works of warehouse in Investor's works in Rogowiec, Gipsowa 5 street
|
2015.01
|
2015.03
|
|
42
|
Babcock Borsig Steinmuller GmbH
|
Making of delivery of parts of pipelines for unit no 12 in Bełchatów Power
|
2014.11
|
2014.11
|
|
43
|
Polimex-Mostostal S.A.
|
Making of erection works for pressure part of boiler (package 3) - erection of pipelines between chambers and coils (making of butt welds pipe - pipe in amount 30.770 items) for unit no 11 in ENEA Wytwarzanie S.A. in Kozienice
|
2015.03
|
2015.11
|
|
44
|
Polimex-Mostostal S.A.
|
Making of erection works for outer high pressure pipelines HP and inner pipelines (package 4) for unit no 11 in ENEA Wytwarzanie S.A. in Kozienice
|
2015.02
|
2016.01
|
|
45
|
Polimex-Mostostal S.A.
|
Making of mechanical erection works for 2 items of air superheaters type Alsotm LCVZQ 34,7 / 2200 for unit no 11 in ENEA Wytwarzanie S.A. in Kozienice
|
2014.11
|
2015.08
|
|
46
|
Andritz Energy & Environment GmbH
|
Manufaturing of nozzle box roofs for invest Busan in South Korea
|
2014.10
|
2014.12
|
|
47
|
EDF Polska S.A.
|
Making of delivery, civil works, erection, start up and commissioning of installation of flue gass ducts in EDF Polska S.A. Power Plant in Rybnik
|
2014.07
|
2016.04
|
|
48
|
Babcock Borsig Steinmuller GmbH
|
Making of delivery of pipelines for digestion and blowing in unit no 11 in Elektrownia Bełchatów
|
2014.06
|
2014.07
|
|
49
|
Andritz Energy & Environment GmbH
|
Making of 1 item of ash silo and 1 item of sand silo for invest Miolby in Sweden
|
2014.06
|
2015.01
|
|
50
|
PGE GiEK S.A. O. Elektrownia Bełchatów
|
Making of transport installation of ash-water high density slurry in PGE GiEK S.A. O. Elektrownia Bełchatów - additional works
|
2014.06
|
2014.12
|
|
51
|
Babcock Borsig Steinmuller GmbH
|
Manufacturing and delivery of cold air ducts for unit no 12 in Elektrownia Bełchatów
|
2014.05
|
2014.08
|
|
52
|
Andritz Energy & Environment GmbH
|
Manufacturing of 3 silos (sand, bed-ash, fly-ash) for invest in EC Siekierki
|
2014.05
|
2014.08
|
|
53
|
Strabag Sp. z o.o.
|
Manufacturing and delivery of steel constructions for invest ,,Making of boiler OP 650K for unit no 9, 10, 11 and 12 in PKE S.A. Elektrownia Łaziska for reduction of NOX emissions"
|
2014.05
|
2014.10
|
|
54
|
RAFAKO S.A.
|
Making of cleaning, removal and utilization of ash from flue-gas duct of unit no 12 in Elektrownia Bełchatów
|
2014.05
|
2014.05
|
|
55
|
Knauf Engineering Sp. z o.o.
|
Making of repair works of hot gas generator in Knauf Jworzno III Sp. z o.o.'s workshop
|
2014.02
|
2014.02
|
|
56
|
PGE GiEK S.A. O. Elekrownia Bełchatów
|
Making of transport installation of ash-water high density slurry in PGE GiEK S.A. O. Elektrownia Bełchatów - additional works
|
2013.10
|
2014.08
|
|
57
|
PGE GiEK S.A. O. Elekrownia Bełchatów
|
Making of modernization of secondary superheat pipelines of units No 9-12 in PGE GiEK S.A. O. Elektrownia Bełchatów
|
2013.09
|
2016.09
|
|
58
|
Babcock Borsig Steinmuller GmbH
|
Making of erection works (package No 5.2) for boiler No 12 in PGE Bełchatów Power Plant
|
2014.04
|
2014.12
|
|
59
|
Babcock Borsig Steinmuller GmbH
|
Making of erection works (package No 4.1) for boiler No 12 in PGE Bełchatów Power Plant - connective pipelines of boiler's chambers
|
2014.04
|
2014.08
|
|
60
|
Babcock Borsig Steinmuller GmbH
|
Making of erection works (package No 5.2) for boiler No 11 in PGE Bełchatów Power Plant
|
2013.11
|
2014.07
|
|
61
|
Babcock Borsig Steinmuller GmbH
|
Making of erection works (package No 4.1) for boiler No 11 in PGE Bełchatów Power Plant - connective pipelines of boiler's chambers
|
2013.11
|
2014.07
|
|
62
|
Knauf Bauprodukte Polska Sp. z o.o.
|
Making of foundations of coal dust silo and bridge support of pipelines in plant of Knauf Bauprodukte Polska Sp. z o.o. in Rogowiec
|
2013.09
|
2013.09
|
|
63
|
Knauf Bauprodukte Polska Sp. z o.o.
|
Making of technology building (first floor) in plant of Knauf Bauprodukte Polska Sp. z o.o. in Rogowiec
|
2013.09
|
2013.12
|
|
64
|
Andritz Energy & Environment GmbH
|
Manufacturing of steel constructios for project DOMSJO in Sweden
|
2013.08
|
2013.09
|
|
65
|
Andritz Energy & Environment GmbH
|
Making of prefabrication of air ducts and flue gas ducts for project FHW ARSENAL in Austria
|
2013.07
|
2013.10
|
|
66
|
Fabryka Wenylatorów FAWENT S.A.
|
Making of disassembly works and assembly works for two silencers of suction ducts for two air fans for boiler No 6 in PGE GiEK S.A. O. Elekrownia Bełchatów
|
2013.06
|
2013.10
|
|
67
|
Andritz Energy & Environment GmbH
|
Manufacturing of elements of ducts and silos for project VARTAVERKET - Stockholm in Sweden
|
2013.09
|
2014.06
|
|
68
|
GBT Polska Sp. z o.o.
|
Making of disassembly and assembly of 2x4 items of absorber's circular pipelines for modernization of unit 5 and 6 in PGE Bełchatów Power Plant
|
2013.07
|
2013.09
|
|
69
|
Andritz Energy & Environment GmbH
|
Manufacturing of flue ducts and air ducts for project Nymolla in Sweden
|
2013.06
|
2013.08
|
|
70
|
Zespół Elektrociepłowni Wrocławskich KOGENERACJA S.A.
|
Making of fire and explosion protection of installation for biomass silos in EC Czechnica
|
2013.05
|
2013.08
|
|
71
|
RAFAKO S.A.
|
Manufacturing, delivery, disassembly and assembly of parts for IOS' modernization of unit 5 and 6 in PGE Elekrownia Bełchatów
|
2013.05
|
2015.04
|
|
72
|
PGE GiEK S.A. O. Elektrownia Bełchatów
|
Making of erection-welding works for pipelines of M2 superheater in unit no 2 in PGE Bełchatów Power Plant
|
2013.05
|
2013.05
|
|
73
|
Knauf Bełchatów Sp. z o.o.
|
Delivery and assembly of ventilation in calcination house in Knauf Bełchatów Sp. z o.o.
|
2013.05
|
2013.05
|
|
74
|
Zakład Wodociągów i Kanalizacji WOD-KAN Sp. z o.o.
|
Building and modernization of water and sewerage network in Bełchatów
|
2013.04
|
2014.09
|
|
75
|
Politechnika Wrocławska
|
Delivery, assembly and start up of pilot heat recovery installation of waste heat from outlet ducts of BB-1150 boiler in PGE Bełchatów Power Plant
|
2013.04
|
2013.05
|
|
76
|
Knauf Bełchatów Sp. z o.o.
|
Making of cladding of walls and roof of calcination house in Knauf Bełchatów Sp. z o.o.
|
2013.04
|
2013.06
|
|
77
|
Knauf Bełchatów Sp. z o.o.
|
Delivery and erection of ducts in Knauf Bełchatów Sp. z o.o.
|
2013.03
|
2013.06
|
|
78
|
PGE GiEK S.A. O. Elektrownia Bełchatów
|
Making of delivery of appliances and equipments, making of disassembly works and assembly works, start up, adjustment operation, test run for invest ''Transport of ash-water high density slurry in PGE GiEK S.A. O. Elektrownia Bełchatów"
|
2013.01
|
2015.01
|
|
79
|
Babcock Borsig Steinmuller GmbH
|
Delivery of materials for blowig system for unit no 8 in PGE GiEK S.A. O. Elektrownia Bełchatów
|
2012.12
|
2013.02
|
|
80
|
Elektrownia Połaniec S.A. - Grupa GDF Suez Energia Polska
|
Making of agro biomass plant and forest biomass plant in Elektrownia Połaniec
|
2012.11
|
2013.11
|
|
81
|
Babcock Borsig Steinmuller GmbH
|
Making of erection works for damper for unit no 8 in PGE GiEK S.A. O. Elektrownia Bełchatów
|
2012.12
|
2012.12
|
|
82
|
Babcock Borsig Steinmuller GmbH
|
Making of disassembly works of duct for unit no 8 in PGE GiEK S.A. O. Elektrownia Bełchatów
|
2012.11
|
2012.12
|
|
83
|
Andritz Energy & Environment GmbH
|
Manufacturing of steel constructions for invest Vasilicos in Cyprus
|
2012.10
|
2012.10
|
|
84
|
Andritz Energy & Environment GmbH
|
Manufacturing of air and flue gas ducts for invest Blackburn Meadows in Great Britain
|
2012.10
|
2013.05
|
|
85
|
Andritz Energy & Environment GmbH
|
Manufacturing of air and flue gas ducts for invest Temiscaming in Canada
|
2012.08
|
2012.10
|
|
86
|
Andritz Energy & Environment GmbH
|
Manufacturing of steel elements ,,Kohleschurren" for invest Yunus Emre in Turkey
|
2012.08
|
2012.09
|
|
87
|
Wallstein Ingenieur GmbH
|
Making of electrical works and I & C works for invest called modernization of IOS heat exchanger of unit no 7 in PGE GiEK S.A. O. Elektrownia Bełchatów
|
2012.07
|
2012.08
|
|
88
|
Knauf Bełchatów Sp. z o.o.
|
Manufacturing and erection of steel construction of calcination building for Knauf company in Rogowiec
|
2012.07
|
2012.08
|
|
89
|
Knauf Bełchatów Sp. z o.o.
|
Making of technical building with laboratory for new mixing building and production line of gypsum in Knauf company in Rogowiec
|
2012.06
|
2012.09
|
|
90
|
Babcock Borsig Steinmuller GmbH
|
Manufacturing and delivery of materials (pipes, molders, supports, corrosion protection) for devices of unit no 7 in PGE GiEK S.A. O. Elektrownia Bełchatów
|
2012.06
|
2012.07
|
|
91
|
RAFAKO S.A.
|
Manufacturing of platforms of electrofilter axes 1 with fasteners for invest called replacement of electrostatic precipitator of unit no 3 in Elekrownia Kozienice
|
2012.06
|
2012.06
|
|
92
|
RAFAKO S.A.
|
Making of repair works of flue gass ducts, delivery and making of rubber coating for modrnization of gass heating system of units no 8, 10, 11 and 12 in PGE GiEK S.A. O. Elektrownia Bełchatów
|
2012.06
|
2016.03
|
|
93
|
RAFAKO S.A.
|
Making of erection works of boiler OS-95 of garbage incineration in Roskilde KARA / NOVERN I/s Denmark
|
2012.05
|
2013.05
|
|
94
|
Babcock Borsig Steinmuller GmbH
|
Making of erection of part of cold air ducts 07NG02 for unit no 7 in PGE GiEK S.A. O. Elektrownia Bełchatów
|
2012.05
|
2012.05
|
|
95
|
Wallstein Ingenieur GmbH
|
Making of modernization of gas-gas heat exchanger for unit no 7 in PGE GiEK S.A. O. Elektrownia Bełchatów
|
2012.04
|
2012.08
|
|
96
|
RAFAKO S.A.
|
Making and delivery of stainless elements to building site of IOS unit no 1 and 2 in PGE GiEK S.A. O. Elektrownia Bełchatów
|
2012.04
|
2012.05
|
|
97
|
Babcock Borsig Steinmuller GmbH
|
Making of repair works for surfaces M2 and P3 for unit no 7 in PGE GiEK S.A. O. Elektrownia Bełchatów
|
2012.02
|
2012.05
|
|
98
|
RAFAKO S.A.
|
Manufacturing and test erection of 12 sets of ash hoppers for steam boiler in garbage incineration in Roskilde KARA / NOVERN I/s Denmark
|
2012.02
|
2012.04
|
|
99
|
Babcock Borsing Steinmuller GmbH
|
Making of disassembly and assembly works for pakage No 6 in unit No 8 in PGE GiEK S.A. O. Elektrownia Bełchatów
|
2012.02
|
2012.10
|
|
100
|
Babcock Borsing Steinmuller GmbH
|
Making of disassembly and assembly works for pakage No 4 in unit No 8 in PGE GiEK S.A. O. Elektrownia Bełchatów - connective pipelines of boiler's chambers
|
2012.02
|
2012.10
|
|
101
|
Babcock Borsing Steinmuller GmbH
|
Making of disassembly and assembly works for pakage No 6 in unit No 7 in PGE GiEK S.A. O. Elektrownia Bełchatów
|
2012.02
|
2012.06
|
|
102
|
Babcock Borsing Steinmuller GmbH
|
Making of disassembly and assembly works for pakage No 4 in unit No 7 in PGE GiEK S.A. O. Elektrownia Bełchatów - connective pipelines of boiler's chambers
|
2012.02
|
2012.06
|
|
103
|
Knauf Bełchatów Sp. z o.o.
|
Execution of gypsum silo, capacity 1000 ton, with necessary technical equipment in client's workshop in Rogowiec
|
2012.02
|
2012.03
|
|
104
|
Alstom Power Sp. z o.o.
|
Making of services for guarantee's period of 858MW unit in PGE GiEK S.A. O. Elektrownia Bełchatów
|
2012.01
|
2014.12
|
|
105
|
Knauf Bełchatów Sp. z o.o.
|
Making of reinforced concrete foundations of building of mixing of construction materials and gypsum calcination plant with appliances in Investor's workshop in Rogowiec
|
2011.12
|
2012.02
|
|
106
|
Elektrociepłownia Białystok S.A.
|
Making of additional works for invest ,,Making of heat accumulator for heating system in EC Biaystok”.
|
2011.11
|
2011.12
|
|
107
|
PGE Górnictwo i Energetyka Konwencjonalna S.A. Oddział Elektrownia Bełchatów
|
Making of works for invest ,,Ash landfill ,,Zwałowisko” - repair works for drainage ditches and drain pipes in western side, tank no 3 – repair works of demages" in PGE GiEK S.A. O. Elektrownia Bełchatów
|
2011.11
|
2011.11
|
|
108
|
GBT POLSKA Sp. z o.o.
|
Manufacturing and delivery of steel tanks
|
2011.10
|
2011.12
|
|
109
|
Knauf Bełchatów Sp. z o.o.
|
Making of structure of: mixing tower with necessary appliances and infrastructure in Inwestor's workshop in Rogowiec.
|
2011.10
|
2012.06
|
|
110
|
Zespół Elektrociepłowni Wrocławskich KOGENERACJA S.A.
|
Project, delivery, erection and start up of pulsator's installation of cleaning system for internal walls in biomass tank in EC Wrocław
|
2011.10
|
2011.12
|
|
111
|
Zespół Elektrociepłowni Wrocławskich KOGENERACJA S.A.
|
Manufacturing and erection of biomass tank in EC Wrocław
|
2011.10
|
2011.11
|
|
112
|
PGE Górnictwo i Energetyka Konwencjonalna S.A. Oddział Elektrownia Bełchatów
|
Manufacturing and delivery of exchangers for Condensate Polishing Plant of boilers no 7 and 8 in PGE GiEK S.A. O. Elektrownia Bełchatów
|
2012.01
|
2012.06
|
|
113
|
RAFAKO S.A.
|
Manufacturing, delivery and supervision over erection and start up of vessels of inertial material and bottom ash, for boiler Ofz-201 for PKE S.A. Elektrownia Jaworzno III - Elektrownia II
|
2011.06
|
2011.08
|
|
114
|
RAFAKO S.A.
|
Manufacturing and delivery of flue gass ducts for set 6110 and air ducts for RPP for PKE S.A. Elektrownia Jaworzno III - Elektrownia II
|
2011.06
|
2011.10
|
|
115
|
Knauf Bauprodukte Polska Sp. z o.o.
|
Delivery and erection of 2 silos V = 60 m3 and steel constructions of building
|
2011.05
|
2011.06
|
|
116
|
PGE Górnictwo i Enegetyka Konwencjonalna S.A. Oddział Elektrownia Bełchatów
|
Execution of works for pressure parts of boiler no 10 in PGE GiEK S.A. O. Elektrownia Bełchatów
|
2011.05
|
2011.05
|
|
117
|
RAFAKO S.A.
|
Delivery and manufacturing of rubber coating for absorber, vessels and flue gass ducts with surface preparation for IOS of units no 1 i 2 in PGE GiEK S.A. O. Elektrownia Bełchatów
|
2011.05
|
2012.04
|
|
118
|
Alstom Power Sp. z o.o.
|
Making of works for auxiliary power station turbine BFPT failure for unit 858 MW in PGE GiEK S.A. O. Elektrownia Bełchatów
|
2011.01
|
2011.07
|
|
119
|
RAFAKO S.A.
|
Manufacturing of parts of electrostatic percipitator - unit B2 in Obrenovac Power Plant in Serbia
|
2011.01
|
2011.03
|
|
120
|
Przedsiębiorstwo Innowacyjno-Proukcyjne INKOM Sp. z o.o.
|
Execution of technological and erection works for invest: ,,Modernization of pump and hydrophone station S-3" in PGE GiEK S.A. O. Elektrownia Bełchatów
|
2011.01
|
2012.05
|
|
121
|
Elektrociepłownia Białystok S.A.
|
Making of additional works for invest; ,,Execution of heat accumulator for heating system in EC Białystok S.A."
|
2010.12
|
2010.12
|
|
122
|
Zespół Elektrociepłowni Wrocławskich KOGENERACJA S.A.
|
Delivery of spare parts for appliances of biomas system of boiler K2 in ,,Czechnica" Heat and Power
|
2010.12
|
2010.12
|
|
123
|
PGE Górnictwo i Enegetyka Konwencjonalna S.A. Oddział Elektrownia Bełchatów
|
Making of additional works for invest: ,,Execution of technical landfill site infrastructure and flexible membrane liner in tank no 3 in ,,Zwałowisko" ash landfill in Bełchatów Power Plant.
|
2010.12
|
2010.12
|
|
124
|
PGE Górnictwo i Enegetyka Konwencjonalna S.A. Oddział Elektrownia Bełchatów
|
Repair of demage of pump station W-4 in Bełchatów Power Plant
|
2010.11
|
2010.12
|
|
125
|
PGE Górnictwo i Enegetyka Konwencjonalna S.A. Oddział Elektrownia Bełchatów
|
Modernization of ion-exchanger station G-4.2, northern duct and unloading platform of chemicals in Bełchatów Power Plant
|
2010.11
|
2011.12
|
|
126
|
Elektrociepłownia Białystok S.A.
|
Making of additional works for invest; ,,Execution of heat accumulator for heating system in EC Białystok S.A."
|
2010.10
|
2010.11
|
|
127
|
RAFAKO S.A.
|
Manufacturing, delivery and erection of absorbers, flue gas fan, flue gas ducts with heat exchanger and supporting constructions for IOS of units no 1 and 2 in Bełchatów Power Plant
|
2010.09
|
2012.04
|
|
128
|
Elektrociepłownia Białystok S.A.
|
Building of heat system in Białystok Heat and Power Plant
|
2010.07
|
2012.01
|
|
129
|
Zespół Elektrociepłowni Wrocławskich KOGENERACJA S.A.
|
Modernization of infrastructure in biomass plant in EC Czechnica
|
2010.06
|
2010.07
|
|
130
|
RAFAKO S.A.
|
Manufacturing and delivery of inlet and exit flue gas ducts for electrostatic percipitator of boiler BB-1150 of unit no 5 and 6 in Bełchatów Power Plant
|
2010.05
|
2010.10
|
|
131
|
CHEMAR POWER AND INDUSTRIAL SERVICES Sp. z o.o.
|
Modernization of central steam and water pipelines for unt no 6 in Bełchatów Power Plant
|
2010.04
|
2011.06
|
|
132
|
RAFAKO S.A.
|
Manufacturing, delivery and erection of elements of flue gas ducts and suporting constructions for smoke conduits of IOS of unit no 1 and 2 in Bełchatów Power Plant
|
2010.04
|
2010.07
|
|
133
|
Zespół Elektrociepłowni Wrocławskich KOGENERACJA S.A.
|
Modification of weighting system for biomass fuel handling system in EC Czechnica
|
2010.04
|
2010.07
|
|
134
|
PGE Górnictwo i Enegetyka Konwencjonalna S.A. Oddział Elektrownia Bełchatów
|
Rebuilding and strengthening of roof +30,7 m over track-way C12 and C32 in bunker PII/4 in Bełchatów Power Plant
|
2010.04
|
2011.10
|
|
135
|
Chemar Rurociągi Sp. z o.o.
|
Modernization of central steam and water pipelines for unt no 5 in Bełchatów Power Plant
|
2010.03
|
2010.12
|
|
136
|
Chemar Rurociągi Sp. z o.o.
|
Full mechanical disassembly and erection of by-pass pipeline of boiler's system (LOS 4) for unit no 5 in Bełchatów Power Plant
|
2010.03
|
2010.12
|
|
137
|
Alstom Power Sp. z o.o.
|
Manufacturing and delivery of cooling water pipelines between unit 858 MW and CO2 Capture industrial plant in Bełchatów Power Plant
|
2010.03
|
2010.07
|
|
138
|
Alstom Power Sp. z o.o.
|
Erection of cooling water pipelines for CO2 Ready Project in Bełchatów Power Plant
|
2010.03
|
2010.11
|
|
139
|
RAFAKO S.A.
|
Manufacturing, delivery and erection of sulferized and desulferized flue gas ducts and erection of appliances for MIOS in EC Siekierki
|
2010.02
|
2011.06
|
|
140
|
RAMB Sp. z o.o.
|
Manufacturing and delivery of construction of conveyor
|
2010.01
|
2010.02
|
|
141
|
Knauf Bauprodukte Polska Sp. z o.o.
|
Making of assembly of production facilities in factory building
|
2009.12
|
2010.01
|
|
142
|
PGE Elektrownia Bełchatów S.A.
|
Modernization of pump station W-4 in Bełchatów Power Plant
|
2009.11
|
2010.12
|
|
143
|
Fortum Heat Polska Spółka z o.o.
|
Delivery of materials for low pressure pipelines in EC Częstochowa
|
2009.10
|
2009.12
|
|
144
|
Zespół Elektrociepłowni Wrocławskich KOGENERACJA S.A.
|
Extending of power appliances for biomass plant in EC Czechnica
|
2009.10
|
2010.05
|
|
145
|
PGE Elektrownia Bełchatów S.A.
|
Execution of technical landfill site infrastructure and flexible membrane liner of tank no 3 in ,,Zwałowisko” ash landfill.
|
2009.09
|
2011.06
|
|
146
|
Fabryka Kotłów Rafako S.A.
|
Erection of two complete absorbers with platforms and the erecion of the emergency dump tank with platforms -MIOS EC Siekierki
|
2009.05
|
2010.02
|
|
147
|
Konsortium; Alstom Power Sp. z o.o. and Fabryka Kotłów Rafako S.A.
|
Erection of ID and FD fans for unit 858 MW in Bełchatów Power Plant
|
2009.03
|
2010.05
|
|
148
|
Chemar Sp. z o.o.
|
Mechanical erection and disassembly of pipelines for unit 4 in Bełchatów Power Plant
|
2009.03
|
2009.11
|
|
149
|
Konsortium; Alstom Power Sp. z o.o. i Fabryka Kotłów Rafako S.A.
|
Mechanical erection of two Regenerative Air Pre Heaters for unit 858 MW in Bełchatów Power Plant
|
2009.03
|
2009.11
|
|
150
|
Zespół Elektrociepłowni Wrocławskich KOGENERACJA S.A.
|
Fuel Handling Sytem in EC Czechnica - turnkey investment
|
2009.01
|
2011.06
|
|
151
|
Fortum Heat Polska Spółka z o.o.
|
Delivery of materials for low and high pressure pipelines in EC Częstochowa
|
2009.01
|
2009.05
|
|
152
|
Alstom Power Sp. z o.o.
|
Mechanical erection of appliences Pii ROP for unit 858 MW in Bełchatów Power Plant
|
2008.12
|
2010.03
|
|
153
|
Austrian Energy & Environment GmbH
|
Manufacturing of steel elements for combustion chamber and condenser for Maxau project
|
2008.10
|
2009.07
|
|
154
|
Alstom Power Sp. z o.o.
|
Manufacturing and mechanical erection of pipelines SP NP. for unit 858 MW in Bełchatów Power Plant
|
2008.09
|
2009.09
|
|
155
|
Alstom Power Sp. z o.o.
|
Manufacturing and mechanical erection of pipelines package; L09, L11 for unit 858 MW in Bełchatów Power Plant
|
2008.09
|
2010.10
|
|
156
|
Alstom Power Sp. z o.o.
|
Manufacturing, delivery and erection of pipelines under our supervision for unit 858 MW in Bełchatów Power Plant
|
2008.09
|
2009.02
|
|
157
|
BOT Elektrownia Bełchatów S.A.
|
Modernization of heating pipelines system for new quantitative and quality needs
|
2008.05
|
2008.09
|
|
158
|
PGE Elektrownia Bełchatów S.A.
|
Manufacturing of steam pipelines and hydro-ash removal system for unit 858 MW in Bełchatów Power Plant
|
2008.04
|
2009.05
|
|
159
|
BWT Polska Sp. z o.o.
|
Delivery and erection of two clarifier internals for Water Treatment Plant for unit 858 MW in Bełchatów Power Plant
|
2008.04
|
2008.10
|
|
160
|
Austrian Energy & Environment GmbH
|
Manufacturing of flue ducts for unit 7 in Voest Alpine Linz company
|
2008.03
|
2008.08
|
|
161
|
PGE Elektrownia Bełchatów S.A.
|
Modernization of bases under conveyors C12, C22, C32 on roof +27,0 m in conveyor bunker PII/4 in Bełchatów Power Plant
|
2008.02
|
2011.12
|
|
162
|
Alstom Power Sp. z o.o.
|
Delivery of main cooling water pipelines for engine room, pump house and intake of cooling chimney for unit 858 MW in Bełchatów Power Plant
|
2008.01
|
2008.08
|
|
163
|
Alstom Power Sp. z o.o.
|
Manufacturing, delivery and erection of temporary steel covers for openings in roof 0,00 m in boiler house for unit 858 MW in Bechatów Power Plant
|
2007.12
|
2008.01
|
|
164
|
Fabryka Kotłów Rafako S.A.
|
Delivery and erection of steel construction of absorbent house and electrostatic percipitator house for IOS unit 858 MW in Bełchatów Power Plant. Erection of technological appliances in absorbent house for IOS unit 858 MW.
|
2007.08
|
2009.03
|
|
165
|
BOT Elektrownia Bełchatów S.A.
|
Erection of steam pipelines under turbine in unit 3
|
2007.08
|
2007.10
|
|
166
|
Fabryka Kotłów Rafako S.A.
|
Manufacturing of flue and air ducts for boiler BB2400 for unit 833 MW in Bełchatów Power Plant
|
2007.07
|
2008.08
|
|
167
|
Alstom Power Sp. z o.o.
|
Delivery and erection of steel construction of cooling water pipelines for unit 833 MW in Bełchatów Power Plant
|
2007.07
|
2008.06
|
|
168
|
Energop Sp. z o.o.
|
Erection of pipelines- left side of boiler no 3 RA, and RB, and erection of exausts in Bełchatów Power Plant
|
2007.07
|
2007.09
|
|
169
|
Fabryka Kotłów Rafako S.A.
|
Manufacturing, delivery and erection of electrostatic percipitator and platforms for IOS modernization, making of III- line of IOS system for unit 3 and 4 in Jaworzno III Power Plant
|
2007.06
|
2008.01
|
|
170
|
Fabryka Kotłów Rafako S.A.
|
Modernization of percipitators no 10, 11 and 12, manufacturing and erection of water vessels, and manufacturing and erection of gypsum vessel in Pątnów Power Plant
|
2007.04
|
2007.12
|
|
171
|
Austrian Energy & Environment GmbH
|
Erection of flue gas ducts, steel construction and process tanks for FGDP in Rybnik Power Plant
|
2007.03
|
2008.02
|
|
172
|
Bełchatów Power Plant S.A.
|
Repair works of high-pressure pipelines unit 1,4,9,10,11,12 in BOT Bełchatów Power Plant
|
2007.03
|
2007.12
|
|
173
|
Alstom Power Sp. z o.o.
|
Designing supply and supervision of pipelines HPMP instalation - turbine set modernisation unit 3 in BOT Bełchatów Power Plant
|
2007.01
|
2007.12
|
|
174
|
Bełchatów Power Plant S.A.
|
Modernisation of Ionites Regeneration Station in BOT Bełchatów Power Plant
|
2007.01
|
2007.12
|
|
175
|
Fabryka Kotłów Rafako S.A. Racibórz
|
Manufacturing, delivery and erection of process water vesel for IOS of units 1-4 in Pątnów Power Plant
|
2006.12
|
2007.05
|
|
176
|
Austrian Energy & Environment GmbH
|
Execution of exaust fume channels - AMAKHULU project
|
2006.11
|
2006.11
|
|
177
|
Zakład Urządzeń Odpylających
|
Manufacturing and erection of boiler for Alpol Gips company
|
2006.10
|
2006.11
|
|
178
|
Fabryka Kotłów Rafako S.A. Racibórz
|
Fabrication, delivery and erection of bag filter , reactor and staircase supporting construction for FGDP in Łódź Thermal-Electric Power Plant
|
2006.07
|
2007.07
|
|
179
|
Turów Power Plant
|
Modernisation of oil tanks in Turów Power Plant
|
2006.07
|
2007.09
|
|
180
|
Fabryka Kotłów Rafako S.A. Racibórz
|
Delivery and erection of steel construction and emergency tank for FGDP in Osrtołęka B
|
2006.07
|
2006.12
|
|
181
|
Fabryka Kotłów Rafako S.A. Racibórz
|
Disassembly and erection works during boiler OP-230 K1 modernisation in Konglomeracja Thermal-Electric Power Plant
|
2006.04
|
2006.12
|
|
182
|
Fabryka Kotłów Rafako S.A. Racibórz
|
Modernization of percipitators for unit 8 in Bełchatów Power Plant
|
2006.03
|
2006.06
|
|
183
|
EC Białystok S.A.
|
Modernization of waste-water disposal management in EC Białystok S.A.
|
2006.01
|
2008.01
|
|
184
|
SNC Lavalin Polska
|
Delivery and erection of water tanks and steel construction for Sorbent Preparation Building in Pątnów Power Plant
|
2005.11
|
2007.07
|
|
185
|
Bełchatów Power Plant S.A.
|
Modernisation of carburisation bridge PIII/11
|
2005.09
|
2005.11
|
|
186
|
Bełchatów Power Plant S.A.
|
Modernisation of carburisation bridge PIII/11 at Bełchatów Power Station
|
2005.09
|
2006.10
|
|
187
|
Fabryka Kotłów Rafako S.A. Racibórz
|
Erection of absorbers with equipment and delivery of absorber parts for FGDP unit 3 & 4 at Bełchatów Power Plant
|
2005.06
|
2006.12
|
|
188
|
Anwil S.A. Włocławek
|
Installation of GRP pipelines for C02,C03,C06,C09a,C09b objects at Anwil S.A. Włocławek
|
2005.05
|
2006.10
|
|
189
|
Elektrociepłownie Wybrzeże S.A.
|
Modernization of water and waste-water disposal management
|
2005.04
|
2006.12
|
|
190
|
Skalski S.A.
|
Expansion of workshop of Apol Gips
|
2005.04
|
2006.12
|
|
191
|
Fabryka Kotłów Rafako S.A. Racibórz
|
Delivery & erection of flue gas ducts and steel support structure for FGDP unit 3 & 4 at Bełchatów Power Plant
|
2005.03
|
2006.10
|
|
192
|
Knauf Bauprodukte
|
Expansion of loading and storage building
|
2005.01
|
2005.05
|
|
193
|
Bełchatów Power Plant S.A.
|
Erection of pump station Chabielice on Krasówka river
|
2004.11
|
2006.01
|
|
194
|
Fabryka Kotłów Rafako S.A. Racibórz
|
Manufacturing of pipeline and supporting construction for oil overpass for IOS for units 3 and 4 in Bełchatów Power Plant
|
2004.10
|
2005.02
|
|
195
|
Pabianickie Zakłady Farmaceutyczne PZF "POLFA" Pabianice
|
Manufacturing of cooling installation for WMF Polfa Pabianice
|
2004.04
|
2004.08
|
|
196
|
Bełchatów Power Plant 97-405 Bełchatów
|
Modernization of housing of carburisation bridge PII/11 in Bełchatów Power Plant
|
2003.11
|
2004.12
|
|
197
|
KNAUF Iphofen Germany
|
Development of KNAUF Bauprodukte
|
2003.10
|
2004.07
|
|
198
|
Bełchatów Power Plant 97-405 Bełchatów
|
Modernisation of carburisation bridge and PI/9 PI/7
|
2003.10
|
2004.06
|
|
199
|
Bełchatów Power Plant 97-405 Bełchatów
|
Electro filter modernisation KTD units: 5,6,8,9,10
|
2003.07
|
2003.12
|
|
200
|
Bełchatów Power Plant S.A.
|
Delivery and installation of pipelines transporting pulp from Bełchatów Power station to the KW Bełchatów mine.
|
2003.06
|
2004.12
|
|
201
|
Austrian Energy & Environment AG Graz
|
Design and production of steel structures for channels in Sarpsborg, Norway
|
2003.05
|
2004.01
|
|
202
|
Austrian Energy & Environment AG Graz
|
Design, production and delivery of steel structures for Zakłady Papiernicze in Świecie
|
2003.02
|
2003.07
|
|
203
|
Pabianickie Zakłady Farmaceutyczne PZF "POLFA" Pabianice
|
Construction of multipurpose Pharmaceutical Warehouse for PZF "POLFA" Pabianice
|
2003.01
|
2004.12
|
|
204
|
Langbein & Engelbracht Bochum Germany
|
Production and delivery of channel and vessel steel structures for projects in Hanover - Germany, Linz Austria, Grevenbroich - Germany, Lipek - Russia, Burgdorf – Switzerland
|
2003.01
|
2003.06
|
|
205
|
Bełchatów Power Plant S.A.
|
Restoring of production capacity of water pre-treatment plant for boiler circulation system in Bełchatów Power Plant
|
2002.12
|
2005.05
|
|
206
|
Enrgomontaż-Północ S.A. 03-876 Warszawa ul. Matuszewska 14
|
Production and installation of reinforcement TG-5 in Pątnów Power Plant II for block 460MW
|
2002.11
|
2003.05
|
|
207
|
Bełchatów Power Plant 97-405 Bełchatów
|
Erection of hydro- ash pipelines with supporting construction
|
2002.07
|
2004.04
|
|
208
|
Bełchatów Power Plant 97-405 Bełchatów
|
Electrofilter modernization KTD bl. number 1-4 and 12
|
2002.08
|
2003.08
|
|
209
|
Bełchatów Power Plant 97-405 Bełchatów
|
Modernisation of carburisation bridge Pl/ll
|
2001.05
|
2002.09
|
|
210
|
Fabryka Kotłów Rafako S.A. Racibórz
|
Delivery and installation of Exhaust fume sulphur removal system in bl. Nr 7 and 9
|
2001.05
|
2003.08
|
|
211
|
Elektrim Megadex S.A.
|
Production and delivery of turboreactor and preseparator for EC Siekierki
|
2001.04
|
2001.06
|
|
212
|
Enrgomontaż-Północ S.A. 03-876 Warszawa ul. Matuszewska 14
|
Electrofilter modernisation for 500 MW block in Kozienice Power Plant
|
2001.04
|
2001.10
|
|
213
|
Enrgomontaż-Północ S.A. 00-450 Warszawa ul. Przemysłowa 30
|
Production and installation of reinforcement TG-5 in Turów Power Plant
|
2001.01
|
2001.07
|
|
214
|
Babcoc Borsing Power Austrian Energy Graz
|
Production and delivery of channels, flooring and vessels for REA Niederrausem
|
2000.12
|
2001.03
|
|
215
|
Kopalnia Węgla Brunatnego "Bełchatów" S.A.
|
Production and construction of a hall TZ-1/TG-4 for mining support services
|
2000.10
|
2001.06
|
|
216
|
KWB Bełchatów
|
Assembly services for KWB Bełchatów
|
2000.04
|
2000.12
|
|
217
|
Rafako S.A. Ul. Łąkowa 33, Racibórz
|
Modernization of IOS block 5 and 6 in Bełchatów Power Plant
|
2000.01
|
2000.09
|
|
218
|
Elektrim Energetyka
|
Assembly and commissioning of 3 boilers in waste incineration station in Norymberg, Germany
|
2000.01
|
2000.12
|
|